Hey, there! Log in / Register
Orange Line platforms getting cloggy; riders getting wet and soggy
By adamg on Wed, 04/25/2018 - 9:12am
Signal problems at Wellington are jamming up Orange Line platforms as trains slow to a crawl. David Christopher reports he's at Wellington, where he watched helplessly as two completely full trains pulled in and then left, with no room for anybody to get on.
Neighborhoods:
Topics:
Free tagging:
Ad:
Comments
New cars and old signals
When does the new fleet of orange line cars go on its maiden voyage? Wont' really change much if the signals never work.
You can have the shiniest,
You can have the shiniest, most impressive train cars on the track, but it doesn't really improve service if the signals are still shitty.
Just wait till Wynn/MGM opens
More people. Shiny trains, same ol' signals
A repeat of Singapore
Singapore said, eh, no need to rush the Marina Bay Sands casino rail link. When it happens it happens. Month one, traffic apocalypse. Singapore scrambles to link rail with MBS
The signals will be upgraded.
The signals will be upgraded. There is a request for proposals out right now for a design-build firm to upgrade the entire signal system on the Red and Orange Lines. Estimated completion is currently scheduled for 2022.
The signals will be upgraded.
lol
nearly laughed myself to death there
Unfunded
Key point
When I got into North Station about 8:30
they had short turned at least one train, as it pulled in completely empty.
Insult to injury
What would add insult to injury, granted this was a signal issue and not a train issue, is if the test cars were on the tracks at Wellington at the time of the signal problem. They were there just north of the Wellington platform around 6 this morning when I was on the Orange Line headed to Boston.
Just Like the Title
n/t