By adamg on Fri., 12/29/2017 - 7:43 am
Some sort of track problem has disabled the Orange Line between Wellington and Community College, so the T is running buses instead.
Topics:
Neighborhoods:
Free tagging:
Like the job UHub is doing? Consider a contribution. Thanks!
Ad:
Comments
Lovely. Enjoy the subzero
By anon
Fri, 12/29/2017 - 8:00am
Lovely. Enjoy the subzero temps, Gaf.
Oh, I will
By adamg
Fri, 12/29/2017 - 12:53pm
From the comfort of our heated house - you don't think I'm going out in that, do you?
Well, OK, I might, to look for iced-up boats or something ...
Is this the second time this
By anon
Fri, 12/29/2017 - 8:14am
Is this the second time this morning that they're running buses on the Orange Line in that section?
On the traffic report during the 6 a.m. news they mentioned that they were operating shuttle buses on the orange line but on the subsequent traffic report they said everything was back to normal.
Now checking my email there's another alert with a timestamp of 717 showing that they're running shuttle buses again
Also a disabled train at
By Kinopio
Fri, 12/29/2017 - 8:51am
Also a disabled train at Tufts. They shutdown the orange line a bunch of weekends to supposedly prepare for winter but now people are freezing outside and can't get to work so what was the point?
MBTA construction crews and
By anon
Fri, 12/29/2017 - 11:34am
MBTA construction crews and/or contractors made an awful lot of money, of course.
So much for the Winter Resiliance Program
By Waquiot
Fri, 12/29/2017 - 8:52am
I mean, old trains breaking down is one thing, but how many week-ends of shuttle buses have happened over the past 2 summers to make sure the rails are in good shape when it gets cold?
I'm sure the excuse will be
By anon
Fri, 12/29/2017 - 11:33am
I'm sure the excuse will be that "winter resilience" work was for resilience against extreme snow/ice storms, like what happened in the winter of 2014/15. Not extreme cold. That'll take another 2 years of completely different "winter resilience" work. And of course lots more money.
Just imagine how worse things
By anon
Fri, 12/29/2017 - 11:36am
Just imagine how worse things would be without the Winter Resilience Program. Just imagine!!!
lucky
By Ishmael Jones
Fri, 12/29/2017 - 10:03am
I just missed the train leaving Oak Grove, which was the last run on which they were shuttling. Got on the next one; it was announced that the train would end at Wellington and there would be shuttles, but at Wellington they announced they were running through to Boston.
Spoke with a woman who got on at Community who was much pleasanter that I would have been under the circumstances; she was talking about the horror shows at Wellington and Community, waiting for shuttles, then the backup entering the station at Community. I believe she said it was a 40 minute wait to get on the train I was riding.
Here's to a 2018 of the T running smoothly! (Yeah, right.)
I got shuttled from Sullivan
By Chip Olson
Fri, 12/29/2017 - 10:18am
I got shuttled from Sullivan to Community College; there was quite a wait for a train and then I was confused when a train came in from Sullivan (very slowly) with people on it. Guessing that was the same one you were on. Given the cold I was assuming the problem was a broken rail and it would take quite a while to fix, but maybe it doesn't take that long.
Here's hoping for more
By Tim Mc.
Fri, 12/29/2017 - 6:00pm
Here's hoping for more breakdowns, eliciting ever more Lehrer-esque rhymes from Adam. :-)
Add comment